Canada – Heavy Lift Vessel (HLV) EOI for GBS Construction
Mon, 25 November 2013
International contractor looking for interested partners to submit an EOI related to the provision of a Sheerleg Crane Barge or Heavy Lift Vessel (HLV) to assist with GBS construction.
The scope of work includes:
the provision of a Sheerleg Crane Barge or Heavy Lift Vessel (HLV) to assist with GBS construction
installation of pump caissons, structural decks, etc. at the Deep Water Site (DWS).
The work will start in approximately November 2014 for about 8-12 months.
Minimum crane lift capacity of 350Te @ 57m outreach and 60m lift (excluding rigging).
Companies must be able to provide qualified marine crew, deck crew, crane operators, technicians and supervisors to operate the vessel and/or crane.
Opportunity Type: Prequalification
Response deadline: 02/12/2013
Deadline: 04/12/2013
http://www.ukti.gov.uk/export/sectors/marine/businessopportunity/657540.html